The elevated storage tank relies on the composite strength of concrete with the tensile strength of steel to minimize operational and maintenance costs over the life of the tank.

The elevated storage tank relies on the composite strength of concrete with the tensile strength of steel to minimize operational and maintenance costs over the life of the tank.

MSA helped La Porte City complete a comprehensive review of its water system, including management and operations, within the tight schedule required by the Iowa Department of Natural Resources. Following a review of the system, which included a water rate analysis, MSA developed a standard operating procedures manual, a preventative maintenance plan, an emergency response plan and a capital improvements plan. MSA then designed and provided construction services for a new composite elevated tank, upgrades to the radium removal facility, the infrastructure to create a single pressure zone system, and a new deep well. The project team used reverse circulation drilling to construct the well--a first in Iowa.

MSA assisted the Utility in obtaining a $755,000 grant from the Iowa Jobs grant program to help fund the improvements. The remainder of the project was funded with a low interest loan through the State Revolving Fund program. MSA assisted with funding administration throughout the project duration.