Petenwell Park Improvements | Adams County, WI

Stormwater Quality Master Plan

Client: City of Middleton
Location: Middleton, WI


Pictured above is one of the alternatives we identified to bring the City into compliance with regulatory requirements. The City has since constructed the above pond.

Pictured above is one of the alternatives we identified to bring the City into compliance with regulatory requirements. The City has since constructed the above pond.

MSA prepared a Stormwater Master Plan for the City of Middleton, as required to comply with the requirements of its NPDES permit. Our team prepared a WinSLAMM stormwater quantity model of the entire, 17,714-acre area draining to and through the City. We then used the model to evalute total suspended solid (TSS) reduction provided by 96 existing stormwater management facilities within the stormwater drainage system. Ultimately, our study found that the City fell short of the regulatory requirement to reduce TSS by 40%. In our plan, we identified four alternatives the City could implement to comply with regulations.

Services Provided

Follow MSA on Facebook  Follow MSA on LinkedIn  Follow MSA on Twitter 
© Copyright 2018 MSA Professional Services, Inc. All rights reserved.
MSA (800) 362-4505